Welcome to GEL Installation

Garmendale Engineering have a fleet of fully equipped vans with teams of experienced installation engineers to carry out a wide range of different installation requirements. GEL engineers are trained to the highest Health & Safety standards and GEL are registered with a number of Health and Safety organisations including safecontractor and CSCS.

All our engineers are confined space trained, all carry CSCS cards, and are trained in the use of fork lift trucks, cherry pickers, scissor lifts etc.

The vans are fully equipped with harnesses for working at height, full sets of hand tools and all electric tools required.

GEL have experience in installing submersible pumping stations and all equipment associated with Sewage Treatment Works and Water Treatment Works.

GEL install equipment onto the London Eye, where all work is carried out during night time hours and is subject to the highest safety requirements.

GEL install equipment and structural steel for British Gypsum, Lear Corporation, British Aerospace, Rolls Royce, and for the majority of water companies in the UK